NextGen > Data Migration Plan

Why

Data migration from old to the new platform has risks of:

  • Costly downtime
  • Corrupted, lost, and misplaced data
  • Compatibility issues
  • Bad performance
  • Data security and privacy breach

A thorough data migration plan is essential to select, prepare, cleanse, transform, and transfer the data from the old to the new product.

How

Identify data formats (Existing and New)

A clear understanding of the source and target data is key to the success of your migration project. Consider getting the business team and users involved to find the business use and the meaning of your data schemas. It’s useful to record decisions taken and reasons in mapping, cleansing, and transformation.

Backup and version data

Things that can go wrong during a migration project. You need to have a mechanism to take snapshots or continuously version your data during different migration processes.

Identify migration tooling

Most migration projects are complicated and require the support of proper tooling. Data migration is usually not a one-time procedure, but continuous porting during a period. Many ETL tools exist and should be validated for features and flexibility.

Select, prepare and cleanse

Some data in the legacy datastore might not be relevant in the new business models. Also, well transformed historical data will perform faster in a new data scheme.

Validate data

New system features, business processes, and permission models could get violated with legacy data. For example, some mandatory fields in the new system may not be available in the legacy data. It would be best if you validated the data migration plan for the following key attributes:

  • Relevance: Is the migrated data relevant to its intended purpose?
  • Accuracy and Completeness: Is it correct, and can it be validated to provide all information?
  • Integrity and Consistency: Is it coherent, logical, and easily understood?
  • Timeliness. Is it up to date for use with new business processes?
  • Compliance: Does it comply with regulatory standards?

Move the data

The most effective time for a migration switchover is the least active periods, such as weekends, holidays. In case of an unexpected showstopper, you must have the ability to roll-back to a working data version. There are two ways to do the execution:

Big-Bang Migration: Transfer all data within a small-time window and make a complete switch over to the new system. Most of the time, this could result in downtime during the process.

Trickle Migration: In contrast, trickle migration recommends running both systems in parallel. Migration processes keep data continuously synced between the products until the migration is completed. Trickle Migration is a sophisticated design compared to big-bang, but it can result in a safe and smooth transition for the user.

Test the migration

You must perform a full audit for the quality of data, performance, security, and completeness once the migration process is complete. Conduct unit, system, volume, and stress tests.

Plan for maintenance and shut down old systems

Once the transformation is done, Monitor the new environment to verify it’s running smoothly. When you are confident, shut down the legacy system. Ensure you setup data maintenance processes to continuously improve security and performance.

References

Successful Data Migration 7 Step Migration Plan Understanding Data Migration